Treatment of Polluted Drainage Water via Passive Instream Constructed Wetland

Affiliation(s)PIProject periodFunded by
DHS Warwick, John J. 11/01/2006 - 10/31/2009 US Department of Agriculture

Project Description

The main objective of the study is to investigate experimentally and numerically the hydraulic performance of the constructed instream passive wetland based on the previously proposed (in the previous study) design setup alternatives for the purpose of confirming these alternatives or proposing new design setup. The expected outcome of this study will in the form of getting guidelines, setup and dimensions of the optimum design for a constructed instream passive wetland (from the hydrodynamic point of view).